The busiest room

Kitchen Remodeling in Hoschton

From a cabinet and counter swap to a kitchen with a wall gone and an island added, every selection carries its own price, and changes wait for your signature.

Describe your kitchen, problems and all — (000) 000-0000

Where Kitchen Budgets Drift

Kitchen costs tend to grow in two places: layout changes and selections. Relocating the sink or range drags new drain lines, water lines and circuits along with it, and upgrading a cabinet line or counter material partway through changes the price fast.

We handle both the same way. The scope lists the layout work and every selection with a cost, and if you change your mind later, the difference is written up for your signature before anything is reordered.

Kitchen Work We Handle

  • Cabinets and counters

    New or refaced cabinets, countertops, backsplash and hardware, fitted to the refrigerator, range and dishwasher you plan to use before any order is placed.

  • Walls and islands

    Taking out a wall to the dining room or adding an island, with the structural answer worked out before a demolition date goes on the schedule.

  • Lighting and power

    Task lighting under the cabinets, pendants over an island and the added circuits modern appliances draw, all written into the scope with their own cost.

Kitchen Work in Order

  1. Choose and order

    Cabinets, counters, fixtures and appliances are picked and ordered before tear-out, so demolition lines up with deliveries instead of leaving an empty room for weeks.

  2. Open it up

    Cabinets and counters are removed, walls open only where the plan calls for it, and wiring, water lines and drains shift to suit the new layout.

  3. Set, template, trim

    Cabinets are hung and leveled, counters are templated from them, then backsplash, lighting and trim. A walkthrough closes it out, with any touch-ups listed and completed.

Asked About Kitchens

How many weeks without a working kitchen?

Usually several, and more with a new layout. There is also a gap people forget: counters get templated from the installed cabinets, so they arrive a little later. That wait is on the schedule from the start.

What if I want to upgrade the counters after signing?

You can. We write up the difference in price and any effect on the schedule, and the new order goes in only after you sign it.

Kitchen Overdue for a Rethink?

Describe the kitchen you cook in now and the one thing you would fix tomorrow if you could. We will talk through the scope and how selections get priced.